- Project Overview:
The Sebago Heights Pump Station is a water booster station in Windham that is experiencing equipment failures and is in need of a controls system upgrade. Portland Water District is looking to get the controls system replaced, including:- Demolition of the two existing pump control panels.
- Design and implementation of a new Telemetry panel, Domestic Pump control panel, and Emergency Fire Pump control panel.
- Code development, integration, and testing.
Attachments
Download All AttachmentsPlan Holders
- rfytfytft5 - fytfytfg, yugyut
- QTO Solutions - Olympia, WA
- Construction Summary of NH/Maine & VT Inc - Manchester, NH
- Blackridge Research & consulting - Peoria, Illinois
- Phelan Construction - North Andover, MA
- PlanHub - West Palm Beach, Florida
- Automatrix, Inc - Winthrop, Maine
- SEER Controls - Appleton, ME
- PB - Sherman, Texas
- Hedstrom Electric PC - Camden, Maine
- Construction Summary Of NH, Maine & Vermont - Manchester, NH