|
East Bridge Street |
|||||||||||||||||||||||
|
|
Map | ||||||||||||||||||||||
| Back | |||||||||||||||||||||||
Project involves the renewal of 2205' of existing 12" ductile iron water main with new 12" PVC (C900) pipe. The location of this project is on East Bridge Street from Bridgton Road (Route 302) to Carlson Street, as shown on the attached map. This project will be undertaken due to the high amount of leaks on this segment of water main. This project is in conjunction with Main Street, Berkeley Street, and Oak Street water main replacements. CLICK ON THE MAP BUTTON FOR THE LIMITS OF THIS PROJECT |
|||||||||||||||||||||||

